In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Termín
01.06.2026
Zveřejněno
14.10.2026
Přiděleno
14.10.2026
D-TRO Project 2026 Support Services
Přiděleno·Oct 28
CareCubed Social Care Costing Software
Přiděleno·Oct 27
Heron Hill - Window & Door Replacement
Přiděleno·Oct 20
Legal Services Contract for the Heart of Barrow
Přiděleno·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Přiděleno·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Přiděleno·Oct 6
Nether Bridge Parapet Repairs
Přiděleno·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Přiděleno·Aug 3
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.