The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended). Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January 2028. • Installation in void formers at 200nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Shafts and Tunnels • Commence May 2027, end December 2027. • Installation in void formers at 50nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Backfill Specification • Commence September 2027, end January 2029. • Installation under main nuclear islands • Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers Provision of Maintenance Team • Commence September 2026, end December 2036 (maybe extended. • Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment. • Undertaking manual monitoring where necessary Additional information: It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above
Zveřejněno
29.04.2026
Otevřeno k podání nabídek
29.04.2026
Termín
08.05.2026
Tunnel Segment Production Monitoring System copy
Uzavřeno·Aug 17
Tunnel Segment Production Monitoring System
Uzavřeno·Aug 12
Site Power HV/LV Electrical Design
Uzavřeno·Aug 10
Tunnel Segment Production Monitoring System
Uzavřeno·Aug 6
Fire and Rescue Services
Uzavřeno·Apr 29
Instrumentation and Monitoring
Uzavřeno·Apr 29
BBV Delta Junction - HSST1040 - Permanent I&M cable tray containment system
Uzavřeno·Sep 8
Instrumentation and Monitoring
Uzavřeno·Apr 29
Full Scale Mooring Test Line Rig ORE/23/089
Přiděleno·Oct 24
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Přiděleno·Oct 31
March 2027 Bus Contracts
Přiděleno·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Přiděleno·Oct 30
Provision of Pre-Paid Cards
Přiděleno·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Přiděleno·Oct 30
Business Travel Services
Přiděleno·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.