The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended). Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January 2028. • Installation in void formers at 200nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Shafts and Tunnels • Commence May 2027, end December 2027. • Installation in void formers at 50nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Backfill Specification • Commence September 2027, end January 2029. • Installation under main nuclear islands • Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers Provision of Maintenance Team • Commence September 2026, end December 2036 (maybe extended. • Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment. • Undertaking manual monitoring where necessary Additional information: It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above
Zveřejněno
29.04.2026
Aktīvs
29.04.2026
Termín
08.05.2026
Tunnel Segment Production Monitoring System copy
Uzavřeno·Aug 17
Tunnel Segment Production Monitoring System
Uzavřeno·Aug 12
Site Power HV/LV Electrical Design
Uzavřeno·Aug 10
Tunnel Segment Production Monitoring System
Uzavřeno·Aug 6
Fire and Rescue Services
Uzavřeno·Apr 29
Instrumentation and Monitoring
Uzavřeno·Apr 29
BBV Delta Junction - HSST1040 - Permanent I&M cable tray containment system
Uzavřeno·Sep 8
Instrumentation and Monitoring
Uzavřeno·Apr 29
Full Scale Mooring Test Line Rig ORE/23/089
Přiděleno·Oct 24
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.