Objectives: • Review and ensure the existing Health Management Plan (HMP) is WI 1150 compliant, including OHS provision, surveillance, wellbeing, exposure monitoring, emergency response, and assurance. • Establish a Health by Design model via a documented Health Hazard Evaluation & Mitigation Process (HHEMP) and design health risk assessments. • Implement a monitoring and controls framework addressing Appendix A hazards and HS2's enhanced exposure standards. • Create templates, SOPs, forms, and toolkits for repeatable use; build internal competency through the development of training materials. • Establish assurance & clinical audit arrangements with clear KPIs, dashboards, and reporting lines (including Project Passport interfaces). • Occupational hygienist services to ensure health hazard identification, exposure monitoring, control advice and design input.
Zveřejněno
04.03.2026
Otevřeno k podání nabídek
04.03.2026
Termín
19.03.2026
Data Transmission Network (DTN) HS2
Uzavřeno·Aug 25
The Operational Telephone System for HS2
Uzavřeno·Aug 5
Radio Frequency Planning Tool for HS2 HRS20
Uzavřeno·Apr 1
Radio Frequency Planning Tool for HS2 HRS20
Uzavřeno·Apr 1
HS2 Occupational Hygienist
Uzavřeno·Mar 4
CDM Advisor (Repairs & Maintenance)
Přiděleno·Sep 21
Dangerous goods safety advisor
Přiděleno·Aug 28
Section 19 Flood Investigation Reports
Přiděleno·Aug 18
Procurement of services for the development and piloting of an ICF-informed case management model for social services in Ukraine
Uzavřeno·Jul 10
GB-Bath: H&S Advisor for UoBath R7 Student Accommodation construction project
Uzavřeno·Jul 8
Provision of Fall Protection Maintenance Services (2)
Přiděleno·May 12
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.