Objectives: • Review and ensure the existing Health Management Plan (HMP) is WI 1150 compliant, including OHS provision, surveillance, wellbeing, exposure monitoring, emergency response, and assurance. • Establish a Health by Design model via a documented Health Hazard Evaluation & Mitigation Process (HHEMP) and design health risk assessments. • Implement a monitoring and controls framework addressing Appendix A hazards and HS2's enhanced exposure standards. • Create templates, SOPs, forms, and toolkits for repeatable use; build internal competency through the development of training materials. • Establish assurance & clinical audit arrangements with clear KPIs, dashboards, and reporting lines (including Project Passport interfaces). • Occupational hygienist services to ensure health hazard identification, exposure monitoring, control advice and design input.
Zveřejněno
04.03.2026
Aktīvs
04.03.2026
Termín
19.03.2026
Data Transmission Network (DTN) HS2
Uzavřeno·Aug 25
The Operational Telephone System for HS2
Uzavřeno·Aug 5
Radio Frequency Planning Tool for HS2 HRS20
Uzavřeno·Apr 1
Radio Frequency Planning Tool for HS2 HRS20
Uzavřeno·Apr 1
HS2 Occupational Hygienist
Uzavřeno·Mar 4
CDM Advisor (Repairs & Maintenance)
Přiděleno·Sep 21
Dangerous goods safety advisor
Přiděleno·Aug 28
Section 19 Flood Investigation Reports
Přiděleno·Aug 18
Procurement of services for the development and piloting of an ICF-informed case management model for social services in Ukraine
Uzavřeno·Jul 10
GB-Bath: H&S Advisor for UoBath R7 Student Accommodation construction project
Uzavřeno·Jul 8
Provision of Fall Protection Maintenance Services (2)
Přiděleno·May 12
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.