This Scheme will cover Active Travel improvements on Shadsworth Road and Haslingden Road, Blackburn, and will encompass the following: • Removal of kerbed centre islands, • Alteration to existing zebra crossing • associated electrical works, • relocation of a kerbline and widening of the footway, • footway reconstruction as necessary, • Alterations to existing AD signage, • Removal and provision of new footway markings, • Footway surface course overlay using tarmac materials or slurry seal • carriageway patching.
Termín
24.03.2026
Zveřejněno
07.07.2026
Přiděleno
07.07.2026
Carriageway Surfacing 25/26 - Phase 4
Přiděleno·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Přiděleno·Sep 28
Carriageway Surfacing 26/27 - Phase One
Přiděleno·Sep 28
Active Travel 2026 - Phase 1
Přiděleno·Jun 10
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Přiděleno·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Přiděleno·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Přiděleno·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Uzavřeno·Oct 21
Thrybergh War Memorial Civil Works
Přiděleno·Oct 7
Greasbrough War Memorial Civil Works
Přiděleno·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Uzavřeno·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Přiděleno·Sep 11
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.