This Scheme will cover Active Travel improvements on Gorse Street and Lower Audley Street, Blackburn And will encompass the installation of an uncontrolled pedestrian crossing with a kerbed centre island, roadmarking alterations, lighting column relocation, replacement lighting columns, associated electrical works, footway reconstruction, fencing and pedestrian controls, removal of trees, traffic signal civils works and carriageway patching.
Termín
05.03.2026
Zveřejněno
10.06.2026
Přiděleno
10.06.2026
Podmínky aktualizovány
10.06.2026
Carriageway Surfacing 25/26 - Phase 4
Přiděleno·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Přiděleno·Sep 28
Carriageway Surfacing 26/27 - Phase One
Přiděleno·Sep 28
Active Travel Improvement Scheme (Phase 2)
Přiděleno·Jul 7
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Přiděleno·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Přiděleno·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Přiděleno·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Uzavřeno·Oct 21
Thrybergh War Memorial Civil Works
Přiděleno·Oct 7
Greasbrough War Memorial Civil Works
Přiděleno·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Uzavřeno·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Přiděleno·Sep 11
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.