This contract is for the construction of the Wairoa Airport Runway Extension project. The Contract Works include, but are not limited to: •Construction of the northern runway extension and associated runway pavement works. •Widening of existing runway pavement areas and southern RESA / turn pad related works. •Earthworks, subgrade preparation, pavement construction and surfacing. •Drainage and stormwater improvements, including culvert extension, stormwater pipe installation, cesspits, concrete dish channels, swale construction, localised drainage grading and associated drainage works. •Airfield pavement marking and associated airport civil works. •Protection of the existing beacon lights. •Environmental management, erosion and sediment control, quality assurance testing, as-built records and completion documentation.
Опубліковано
16.09.2026
Прийом пропозицій
16.09.2026
Кінцевий строк
07.10.2026
14650 - SH1 Ocean Beach Resilience Project - Implementation - Advance Notice
14363 - SH6 Cromwell to Kingston Resilience - PW
15007 - SH6 Inangahua Slip - PW
13965 - Coal Creek Overbridge - PW
HPMV Bridge Strengthening: Oruru Bridge E36
P2026-741 Wastewater Growth Programme – Waipatu Local Servicing
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Усі права захищено.