Joint contracting Authorities, National Transport Authority and Transport Infrastructure Ireland. Luas is Dublin's light rail system and consists of two separate lines, the Red Line and the Green Line. The system comprises 42.5 kilometers of track, three maintenance depots, 67 stops and a fleet of 81 light rail vehicles. Luas carried 48.2 million passenger journeys in 2023. Further expansion of the system is anticipated. A more detailed description of the Luas system is given in Appendix A of the IMPQQ Document. It is anticipated that the Luas Operations and Maintenance Contract will commence operations in Quarter 2 or 3, 2026 for a period of seven years from full operational commencement, with an option to extend by up to a further five to seven years. There will be a mobilisation/transition period from the date of contract signing until the operating commencement date. The scope of the Luas Operations and Maintenance Contract will include operation of public passenger services, rolling stock maintenance, infrastructure maintenance (depots, track, etc.) and management and operation of Luas Park and Ride sites. Maintenance of the automatic fare collection system (AFCS) will also be within the scope of the Operations and Maintenance Contract. It is envisaged that revenue risk will be borne by NTA/TII but that some fare evasion risk will be borne by the Operator. The passenger services to be provided by the Operator will be defined by a service specification. There will be a performance monitoring system in place based on a number of key performance indicators. A more detailed description of the scope of the Luas Operations and Maintenance Contract is given in Appendices B, C, D and E of the IMPQQ Document. The full scope of services required will be set out in the Invitation to Tender documentation which will be issued to the successful parties who are shortlisted following the selection/prequalification stage of the procurement process.
Опубліковано
04.04.2024
Прийом пропозицій
04.04.2024
Кінцевий строк
31.07.2024
TII522 Electrical Renewals Luas Works (Low Voltage) IMPQQ
Intelligent Transport Systems Equipment Frameworks Generation 2
M190 - Specialist Heritage Contract
MetroLink � Environmental Monitoring Services
MetroLink, Dublin � M120 Heavy Civils Enabling Works Framework Agreement
TII516 Climate Adaptation Implementation Plan Technical Services
Establishment of a Multi-Party Framework Agreement for Design and Build Works Contracts for Limerick City and County Council (Projects Less Than €5m Construction Cost)
HSE 28072 Provision of adult respite service for Dublin and North East Regional Health Area (IHA DNC and IHA DNCW)
Dynamic Purchasing System for the Supply of Agricultural Related Machinery
Open Competition for the Provision of Student Placement Software 539
Auto and Inter Coupler Overhaul
Provision of Architect Led Design Team Consultancy Services for Design and Construction of Social Housing Scheme at the site known as the Black Cat, Black Mill Street, Kilkenny