Опубліковано
21.09.2026
Переможця визначено
21.09.2026
Routine Maintenance (6.5km) along Rushwa-Butakya Road at CH:2+300-8+800(CBRM)
Routine Maintenance (5km) along Omurushaka town roads lot 2 (CBRM)
Routine Maintenance (5.2km) along Kiziramuyaga-Kyota Road at CH:0+000-5+200(CBRM)
Routine Maintenance (5km) along Kishoju - Bujuruga roads lot 8 (CBRM)
Routine Maintenance (5.4km) along Kamishango-Kimeya road at CH:16+700-22+100(CBRM)
Routine Maintenance (5.57km) along Kanyambogo-Ibuga road at CH:5+000-10+570(CBRM)
Supply of office consumables and stationeries
Supply of office consumables and stationeries
Supply of Drugs and Pharmaceutical Products
Supply of Doors and Windows
Supply of building materials for foundation, sub and superstructure
Supply of electrical installation materials
© 2026 SIA «Vietne». Усі права захищено.