The overall scope of works for this project is for the construction of a new wastewater pipeline from Katikati Wastewater Treatment Plant across Tauranga Harbour and Matakana Island and including a new marine outfall typically 1150m long. The scope of works for this contract is to provide ECI pre-construction design/methodology inputs to the consenting and design phase for renewal of cross harbour and island sections, as well as concept design inputs for the marine outfall section (not being consented at this stage). ROI Respondents will be shortlisted to two, such that an appropriate mix of construction methods and skills and experience will be represented. Respondents can offer a single method or multiple methods based on their skills and experience. Please refer to the attached ROI for further details. Please raise all questions via GETS.
Опубліковано
02.09.2026
Прийом пропозицій
02.09.2026
Кінцевий строк
25.09.2026
ROI - Otara Wastewater Network Upgrade Design Services
RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build
2813 - Stafford Street and Barnard Street Water Services Renewal
Union Street Foxton - Wastewater and Watermain Renewals 2026-27
Greater Greymouth WTP Pre-treatment Upgrade
Richards Beach Water & Wastewater Reticulation Extension
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». Усі права захищено.