Subject to regulatory approval and owner resolutions, Energie Graz plans to construct an Energetic Sewage Sludge Utilization plant (43.000 t/a mechanically dewatered) on the basis of waste heat recovery using heat pumps, BFB mono-incineration, sewage sludge drying incl. vapor condenser, building, energy distribution, sludge conveying system, dry flue gas cleaning, outdoor facilities, district heating pipeline incl. necessary ancillary services and engineering at the site of City of Graz’ wastewater treatment plant in Gössendorf. The contracting authority explicitly points out that the regulatory approvals have not yet been granted and that all procurement procedures will be carried out subject to committee approval, also due to statutory decision-making requirements. Details will be incl. in the specific tender conditions. Prelim. proposed schedule: Award of contract is expected in: 2026 Start of construction is expected in: 2029 www.energie-graz.at/egg/unternehmen/ekv
Опубліковано
24.07.2024
Прийом пропозицій
24.07.2024
Кінцевий строк
31.10.2024
Sporthallenbodensanierung Sport- und Veranstaltungshalle
Erneuerung des Normenportals inkl. DIN + VDI 2027
Konzeption, Gestaltung und Umsetzung der Corporate Identity und der öffentlichen Website des Tourismusbeschäftigtenfonds, einschließlich laufender Wartung nach Aufwand
Rahmenvereinbarung Tragwerksplanerische Fachplanungs- und Konsulent*innenleistungen für die Sanierung von Wohnhausanlagen der Stadt Wien – Wiener Wohnen (kurz: „WrWKS – Tragwerksplanung II“)
Abruf aus der Rahmenvereinbarung über die Lieferung von Sicherheitstaschen für den Geld- und Werttransport für die GSA gemäß TED Akt.Nr. 2021/S 108-284136, Bekanntmachung ANKÖ ID: 114943-00
LIFE RESTORE for MDD T2.2 Aufweitung Sulzbachmündung 101113557 – LIFE22-NAT-AT-LIFE RESTORE for MDD – LIFE-2022-SAP-NAT
© 2026 SIA «Vietne». Усі права захищено.