Objectives The objective of the project is to on behalf of the Environment Agency (the Contracting Authority) complete an optioneering study for each of the three sites to identify the preferred option for eel passage. This should then be progressed to detailed design suitable for construction. The eel pass design at each site should deliver the following objectives: • To provide long term safe passage of eels past the structure, and operate reliably during eel and elver migration periods • To provide an eel passage solution that can be safely constructed, operated, maintained and decommissioned; • Is cost-effectivecost-effective to maintain, accessible for cleaning and inspections, and allows for monthly checks without specialist knowledge • To provide an eel pass solution that is robust enough to withstand the hydraulic conditions and debris experienced at each structure. • To provide consideration of whole life costs and whole life carbon to support decision making in the determination of the preferred option • To meet the requirements set out in LIT 75351 AM TA Eel Pass, Fish Pass and Fish Counters Maintenance Instruction and Guide. • Non powered solutions are preferred; however, the Environment Agency will consider more innovative solutions for Houghton Weir.
Кінцевий строк
19.06.2026
Опубліковано
16.07.2026
Переможця визначено
16.07.2026
SCC - EK - RFQ - Ecology Support
PRJ_31125 - SWAN Heating & Cooling Offer - Initial Techno, Economic and Planning Perspective Feasibility Study Created
ENVHNL Phase 8 Borehold Drilling Works
Environmental & Conventional Health & Safety Services
EcoSF4 call-off: Le Strange Fish Surveys
Cambridgeshire County Council Minerals and Waste Local Plan Review - Waste Needs Assessment via ESPO Framework via ESPO Consultancy Services Framework 664_25 (Lot 8h)
CA18255 - RFQ2026/24 - NMANDD PEACEPLUS Thriving Together-Minority Community Support Programme: Sports for All for the Newry, Mourne and Down District Council area.
Creative Sector Services CIC (t/a Creative United) Take it away Scheme Credit Provider Contract
Childrens Playtower
2026-09-07 09:00 - QTN048 Exning to Stanton Community Primary School, Stanton - AWARD
Revenues and Benefits Printing and Mailing Service
ITT for project 10181682
© 2026 SIA «Vietne». Усі права захищено.