Currently there are two chillers at the Oncology building. The old R22 refrigerant chiller 2 needs to be replaced with a heat exchanger and pipes to the new chilled water system in the adjacent Parkside building ETP003. The works include construction of a new chilled water system from oncology to Parkside building. Associated works i.e. seismic engineering (NZS 4219), scaffolding, penetrations, lifting out the old R22 chiller through the roof.
Опубліковано
15.09.2026
Прийом пропозицій
15.09.2026
Кінцевий строк
16.10.2026
Southland Hospital MSB5 Ring Main Unit Replacement
Community Based Maternal Mental Health, Peer-led Support for Substance Related Harms
Request For Proposal of Supplier Capability Panel for high-throughput Laboratory Biochemistry Testing (HbA1c) Analysers, Consumables and Maintenance Services
RFP for the Appointment of Suppliers to the Panel for the Supply of Molecular Diagnostics and Testing Technologies, Consumables and Associated Services
Kaiawhina Workforce RFP
After Hours and Urgent Care Services for Timaru
© 2026 SIA «Vietne». Усі права захищено.