The Abbeyfeale Public Realm Scheme Phase 1 consists of upgrading 440 metres on Killarney Road N21; the construction of a 90 metre temporary traffic diversion route from St. Ita’s Terrace to Killarney Road N21; construction of 100 metre new Link Road at O’Riordan’s and upgrading of Grove Crescent car park. The scheme involves laying surface water sewers, box culvert, watermains, foul sewers, ducting, undergrounding of overhead ESB and telecom wires with new services connections to private properties, construction of utility chambers and pillars, public lighting, road reconstruction, surfacing, limestone kerbing, granite slabs, exposed aggregate concrete footpaths, pedestrian crossings, backfilling of basement, installation of electric vehicle chargers, landscaping and associated works. The Abbeyfeale Public Realm Scheme Phase 1 is designed to deliver a high quality public realm scheme to enhance the built environment, improve pedestrian safety for residents and shoppers and increase the level of business in the town of Abbeyfeale. A priority of the scheme is to have the construction works carried out with minimal disruption to residents, shoppers and businesses with an emphasis on pedestrian safety, minimising supply outages, traffic delays and traffic disruption.
Опубліковано
17.10.2024
Прийом пропозицій
17.10.2024
Кінцевий строк
15.11.2024
Limerick City and County Council - Supply of TWO Compact Road Sweepers In 2 Lots
Single Party Framework for Provision of Architectural Model Making Services
Limerick City and County Council on behalf of Askeaton Pool and Leisure DAC - Askeaton Pool and Leisure Centre Maintenance Contract
Limerick City and County Council Provision of Management Development Programme for the Local Enterprise Office Limerick 2025 to 2026
Architect Led Integrated Design Team Services for the Integrated Sports and Educational Campus, Kilmallock Road, Limerick
Limerick City and County Council - Supply of 1 No. Mobile Library Vehicle
Claureen New Link Road
Granard Active Travel Scheme
BusConnects Dublin Core Bus Corridors Infrastructure Works (CBCIW) Framework Agreement
Establishment of a Multi-Party Framework Agreement for Design and Build Works Contracts for Limerick City and County Council (Projects Less Than €5m Construction Cost)
HSE 28072 Provision of adult respite service for Dublin and North East Regional Health Area (IHA DNC and IHA DNCW)
Dynamic Purchasing System for the Supply of Agricultural Related Machinery
Open Competition for the Provision of Student Placement Software 539
Auto and Inter Coupler Overhaul
Provision of Architect Led Design Team Consultancy Services for Design and Construction of Social Housing Scheme at the site known as the Black Cat, Black Mill Street, Kilkenny
© 2026 SIA «Vietne». Усі права захищено.