Loading Otnox...
Otnox
GHGhana·Mnunuzi: BAWKU MUNICIPAL ASSEMBLY

Uer/Bma/Gscsp/Udg-5/Wks/Nct/Lot 2/04/2024

Imetuzwa·4 Sep 2025·GHS 3,000,000

CONSTRUCTION OF 0.754KM KARIYAMA ROAD WITH BITUMINUOS SURFACING, ONE CARRIAGE WAY (2 LANES), OPEN U-DRAINS AT SIDES, STREET LIGHTS, ROAD SIGNS AND MARKINGS

Mwisho wa muda

01.03.2024

Imechapishwa

04.09.2025

Imetuzwa

04.09.2025

© 2026 SIA «Vietne». Haki zote zimehifadhiwa.