The construction of the Ahafo Regional Office started in 2024. The original design is a storey building with a ground and first floor. Currently the structural frame for the ground floor is completed. The proposed 2025 refurbishment is to provide finishes to the walls, floors and the ceiling. Hence the floors of one office room, the conference room, the reception and the corridor as well as the washroom will receive tilling. The electrical system will be installed and connected to the national power grid. Some plumbing works will be carried out. The windows will be glazed and grilles provided for security. Glazed doors and wooden doors shall be installed. Some internal and external painting will climax the finishes to walls and ceiling.
Imechapishwa
18.11.2025
Open
18.11.2025
Mwisho wa muda
18.11.2025
Procurement of Car Tyres and Batteries for Quarterly Labour Force Survey
Procurement of IT Equipment for CPI Rebasing and Related Activities (Laptops, Desktop Computers Printers, Photocopiers, Projector TV Screen, Digital Weighing Scales etc)
Procurement of vehicle for CPI Monitoring (Station Wagons)
Procurement of Stationery and Office Materials for Stores
Framework Agreement for Hiring of Conference Facilities and Hotel Services
Refurbishment of Washrooms at GSS Head Office and Census Secretariat
Construction of ion of 1No.3-Unit Classroom Block with ancilliary facilities at New Obuasi (MP CF)
Procurement of Vehicle Tyres for Duty-Post and Operational Vehicle
Procurement of Chop Boxes and Mattresses
PHAES II FIRE WORKS FOR THE NEW OFFICE BUILDING
Construction of 20M OF 0.9 U drain and 190M of 0.6m u drain at Klana close
Furniture and Office Appliances
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.