Imechapishwa
04.09.2026
Wazi kwa zabuni
04.09.2026
Mwisho wa muda
10.09.2026
Floor replacement at 3 main access control areas of the US Embassy in Lima, Peru
Main Entrance and walkway renovation
Lima - Supply of Lighting Fixtures for the Chancery Facade
Lima - Preventive Maintenance Cooling Towers 3&4
Lima - Preventive Maintenance Cooling Towers 1&2
Main Entrance and walkway renovation
Chiller Maintenance
Buckley SFB - BDOC Chiller Replacement
HVAC Repair by Replacement - 147th MSG
J--GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO
Z--Rosebud Agency HVAC Upgrade
Bldg.19 HVAC Ductwork Insulation Repair-156th WG, Muñiz ANGB, Carolina, P.R
MSANG CRTC 125kW Generator and ATS
Ropes and Container
PRINTED CIRCUIT BOA, IN REPAIR/MODIFICATION OF
Teledyne ACMS Software Subscription C-40 Aircraft
USDA-GIFVL Forklift Repair for Chapman Research Farm in Chapman, Maine
USAFA Ophthalmology Screening Rooms
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.