Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope requires the completion of structural surveys on bridges spanning roads and existing rail assets. Instructed work may include visual and dimensional surveys of assets, ground-breaking activities associated such as foundation pitting and trenching , masonry coring as well as 3D mapping of assets.
Imechapishwa
16.09.2026
Wazi kwa zabuni
16.09.2026
Mwisho wa muda
22.09.2026
Stock Condition Surveys (Commercial and Educational Buildings)
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q1 2026
CA18150 - Area Measurement Reports
ENQ1301 - CYP 2026/27 Condition Surveys
GB-St Helens: Asbestos Surveying Contract Award Notice
A66 - Scheme 3A - Penrith to Temple Sowerby - Primary Survey Control
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
Monitoring Support and Data Management Services for Continuous Air Quality Monitoring Sites
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
SEN20465-SEN-TAXI-THE NEWBRIDGE SCHOOL
Corporate Eyecare Services
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.