The works comprise of two works packages: replacement of the boiler plant and replacement of the mains LV switchboard. The boiler works are to strip out the existing boilers, flues, pipework and redundant oil tank and replace with four new gas boilers complete with new gas and LTHW pipework, a plate heat exchanger, pressurisation units, air and dirt separators flues, and a temporary boiler to maintain heating during the works, along with all associated electrical, controls/BMS, and builders work. The switchboard works are to remove the existing mains LV switchboard, installing a temporary panel board to keep the building powered and subsequently replace with a new mains LV switchboard, re-terminating and partially replacing the existing submains, and testing/commissioning the full installation in coordination with UKPN including surveys and validations
Mwisho wa muda
27.07.2026
Imechapishwa
28.08.2026
Imetuzwa
28.08.2026
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
CWF Lot 2A - Reconstruction of Old Row, Stainton Retaining Wall
CWF Lot 2A - Cockley Beck Cattle Grid Replacement
Radford House - Internal Refurbishment (Change of Use)
NCC1917 Bedlington Terrier Football Ground Demolition
Refurbishment of Bichard Building
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.