The project comprises the replacement of 3nr. chiller units on the Diamond Building Roof. Specifically: •System 1: Comprises 2nr. chiller units. Air handling unit cooling coil systems. •System 2: Comprises 1nr. chiller unit. Floor plate chilled beam systems. Supporting works include: •Coordinating purchase of and managing delivery of chiller units, including managing cranage. •Removal and upgrade of the associated electrical infrastructure. •Removal of existing low-voltage cabling. •Modifications and upgrades to existing electrical switchgear located on the ground floor and basement areas. •Removal and reinstatement of affected internal finishes. •Making good, recertification, and reinstatement of fire stopping measures and compartmentation lines impacted by the works. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Imechapishwa
25.06.2026
Wazi kwa zabuni
25.06.2026
Mwisho wa muda
17.07.2026
CA18455 - R9309 Ferguson House Emergency Lighting
QEHKL232 DC5 Control Panel Replacement
Replacement of DB Boards (SWQ3135,SWQ3136,SWQ3144,SWQ3164)
Barnes Z Block Distribution Board Replacement
W5007 Electric Vehicle Charging Network Infrastructure
Lindsay S and T Blocks Lighting Upgrades
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.