Loading Otnox...
Otnox
UKUfalme wa Muungano·Mnunuzi: Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works

Wazi kwa zabuni·15 Sep 2026·GBP 1,000,000

EKFB are looking for a Subcontractor for the design, supply, installation, management and completion of the Claydon Road Overbridge Access Stairs and Hard Slope (hard landscaping) trial works, including all labour, plant, equipment, materials, temporary works, supervision and quality documentation required to deliver the works. Works to include the following elements Review of the proposed product requirements and recommendation of suitable alternatives where applicable. Preparation and submission of shop drawings for acceptance. Supply and installation of: GRP stair panels Posts Hollow blocks Fixings and consumables Paving slabs Edging kerbs Associated stair and hard slope components Installation of aggregate and topsoil in accordance with permanent works specifications. Identification of any exclusions necessary to complete the works. Trial Works will then inform the methodology on how we proceed going forward with further structures within the G2S section of the works, if successful leading to future works. G2S have approximately 29 sets of Access Stairs of various lengths to be supplied and / or installed.

Imechapishwa

15.09.2026

Wazi kwa zabuni

15.09.2026

Mwisho wa muda

25.09.2026

© 2026 SIA «Vietne». Haki zote zimehifadhiwa.