Loading Otnox...
Otnox
UKUfalme wa Muungano·Mnunuzi: Westmorland and Furness Council

CWF Lot 2B - Broadhead Bridge (Replacement Structure)

Imetuzwa·7 Jul 2026·GBP 150,000

This D&B, 2-Stage Contract, is to reconstruct the bridge, including further actions (and not limited to) liaising with Network Rail (BAPA required for the works), ground investigation, scour assessment, obtaining approvals (i.e. LLFA), collaborative working with WAF Legal Team and Landowners, removal of the rock rolls, training walls repairs and construction, culvert repairs and reinstatement of the highway approach. Construction is to take place during the 2027 'in-river working window', or sooner.

Mwisho wa muda

21.01.2026

Imechapishwa

07.07.2026

Imetuzwa

07.07.2026

© 2026 SIA «Vietne». Haki zote zimehifadhiwa.