The City of Wolverhampton are looking to appoint a consultant to provide Technical Design Services up to RIBA Stage 3b to support the Stage 2 Delivery Funding application under the WMCA Devolved Buildings Retrofit Pilot (PSDS). The design must enable submission of a compliant business case and procurement of a Design & Build contract. The design scope shall include the design for the removal of the existing gas boiler system and any relevant ancillary equipment in the existing system. If components of the existing system are to be reused, the design documentation shall be clear on which parts of the designed system are existing, and which are new.
Mwisho wa muda
17.04.2026
Imechapishwa
25.06.2026
Imetuzwa
25.06.2026
UKRI-3652_083 BAS - Electrical upgrades to central buildings
Refurbishment of Barrington House
Meridian Water - Beacon Partnership Development Managers
Mandela Way Pre-Construction Services
A66 - Works Examiner
Asset Disposal Management Consultancy
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Haki zote zimehifadhiwa.