The Selwyn District Council intends to procure a Design and Construct (D&C) contractor for the replacement of the existing Whitecliffs Bridge over the Selwyn River. The existing bridge has reached the end of its service life and will be demolished and replaced in the same general alignment. The new bridge is expected to be a single‑lane structure with a separated pedestrian footpath, along with associated road, civil, and utility works. The scope includes detailed design, demolition of the existing bridge, construction of the replacement bridge, approach road works, barriers and safety works, utility relocations, traffic management, environmental and cultural management, and project handover.
Zverejnené
21.07.2026
Otvorené na ponuky
21.07.2026
Deadline
29.09.2026
26-213 Rogan Street Signalisation
BRIGHTWATER GXP CIVIL ENABLING WORKS
Wānaka Airport: Runway Strip Widening & Grading, Grass Runway Rehabilitation & Parallel Taxiway Construction
14983 : SH1 Otaika Crossing Signalisation - Physical Works
Te Awaparahi Bay wharf construction
Contract 26/29 - Blake Street Carpark Redevelopment - Registration of Interest (ROI) – Advertising Notice
TWT o Putauaki - Toilet refurbishment - Block B - Boys and Girls
Advance Notice for Activity Based Costing (Software as a Service)
RFT - Main Roofing Contractor for Roofing Project at Halsey Drive School
Request for Tender - Main Contractor for D (T) Roof Replacement at Ashburton College
Main Contractor for Blocks A,B,C,E,F,G,J,M,NS,T,W,U Steel and Membrane Roof, Internal Gutters and Roof Parts Replacements at Waitakere College
Main Contractor for Blocks O,Q,R AMS and ILE Upgrade at Tuakau College
© 2026 SIA «Vietne». Všetky práva vyhradené.