The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.
Deadline
12.02.2026
Zverejnené
04.08.2026
Pridelené
04.08.2026
Planned Roofing Works 27 West
Provisions of External Decoration, Painting and Repair services
GB-Colchester: 0481-PA - Small Flat Roofs (Flats & Maisonettes - Contract G) *Duplicated*
GB-Colchester: Flat Roofing works (small roofs - Houses)
Swarcliffe 2026
Planned Roofing Works 27 North
Workplace Services - Security Guarding
DPS1 1386 - Housing Tree Work
DPS1 1375 - Housing Tree Work
Future Employment Support - EOI
Vehicle Purchase
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
© 2026 SIA «Vietne». Všetky práva vyhradené.