The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form a specific waterproofing system to meet the design requirements. Dependent on the waterproofing system used, the waterproofing materials can be cast into the concrete when poured or applied post pour. The system design is installed to prevent the ingress of water into. The requirement includes 120,000 m2 bonded membrane, 45,000 m2 unbonded membrane, 30,000 l/m joint waterbars, 4,500 l/m hydrophilic waterbars, 15,800 l/m elastomer waterbars, 36,540 l/m PVC waterbars as well as related accessories such as 22,000 units of sealants and adhesives and compressible materials to suit seismic design.
Zverejnené
14.04.2026
Aktīvs
14.04.2026
Deadline
23.04.2026
CA17911 - Roofing Works Leicester College
PAHT - Waterproofing Works in Plantrooms
M6 Lune Gorge - Waterproofing and Expansion Joints
Workplace Services - Security Guarding
DPS1 1386 - Housing Tree Work
DPS1 1375 - Housing Tree Work
Future Employment Support - EOI
Vehicle Purchase
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
© 2026 SIA «Vietne». Všetky práva vyhradené.