Design Options and Viability Assessments for the Future Development of Oxford Town Hall
Deadline
03.06.2026
Zverejnené
27.07.2026
Pridelené
27.07.2026
School Mentoring for resettled refugee families - AWARD
HNES Optimisation Studies for Three Sites - AWARD
Lenovo Laptops_2 - AWARD
RFQ for RIBA Stage 2 Compliant Whole Site Decarbonisation Plans for Two Oxford City Council Depots - AWARD
Sport England Framework - Competitive Procedure - Lot A - AWARD
Sport England Framework - Competitive Procedure - Lot A - AWARD
NW CDF Lot 1 Failure Mode Affect Analysis
NCC1927 Northumberland Local Plan Transport Evidence Base
Full RIBA Feasibility study for Roof Replacement of Stoke Newington Town Hall
Hackney Service Centre cooling system redesign feasibility study
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Všetky práva vyhradené.