Hutt City Council is continuing its programme of investment in natural-turf sportsgrounds to improve drainage performance, turf condition, resilience to wet weather and the number of playable hours available to the community. For the 2026/27 programme, HCC intends to undertake sportsground subsoil drainage and associated improvement works at HW Shortt Park and Memorial Park. The works include installation of lateral and collector subsoil drainage, drainage-disposal infrastructure, targeted grading, turf reinstatement and associated works. At HW Shortt Park, the works include on-site soakage infrastructure because conventional stormwater infrastructure is not available to receive the proposed subsoil drainage flows. The separately renewed cricket block will be completed before the drainage works commence, with this contract including the grading required to blend the surrounding field into the completed cricket-block levels. At Memorial Park, the majority of the proposed drainage system will discharge towards available stormwater infrastructure. A portion of the field cannot discharge by gravity and will require storage and pumped discharge to the stormwater system.
Zverejnené
25.08.2026
Otvorené na ponuky
25.08.2026
Deadline
23.09.2026
CONTRACT 25/106 WOODEND WATER RENEWALS, STORMWATER AND FOOTPATH UPGRADE 2026/27
King Edward Street, Eltham Construction of Open Drain
TWT o Putauaki - Toilet refurbishment - Block B - Boys and Girls
Advance Notice for Activity Based Costing (Software as a Service)
RFT - Main Roofing Contractor for Roofing Project at Halsey Drive School
Request for Tender - Main Contractor for D (T) Roof Replacement at Ashburton College
Main Contractor for Blocks A,B,C,E,F,G,J,M,NS,T,W,U Steel and Membrane Roof, Internal Gutters and Roof Parts Replacements at Waitakere College
Main Contractor for Blocks O,Q,R AMS and ILE Upgrade at Tuakau College
© 2026 SIA «Vietne». Všetky práva vyhradené.