The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1. Secondary metallurgy shall be handled via min. one new twin ladle furnace and via a new twin VD station (twin tank, twin cover, one common set of mechanical pumps).
Zverejnené
20.04.2026
Otvorené na ponuky
20.04.2026
“Nová huť – Purchase and implementation of two automated cold steel billet cutting lines using sawing technology”
Uzavreté·Aug 13
Modernizace pece Velký Stiefel rourovna
Uzavreté·Jul 7
Zvýšení výkonu a modernizace krokové, ohřívací pece P1500
Uzavreté·Jul 7
Modernizace sekundárních ostřiků tratě P1500
Pridelené·Jun 19
Mechanismy na převoz bram a trubek
Pridelené·Jun 19
Lipník n. B. - Drahotuše, BC
Pridelené·Nov 3
„vodárenská Soustava Chotovinsko Tábor – Chotoviny, Výtlačný Řad“
Pridelené·Nov 3
VZ Smilovice - rekonstrukce ubytovny - II. etapa - Dodatek č. 1
Pridelené·Nov 3
Nemocnice Písek – modernizace porodnice
Otvorené na ponuky·Nov 3
Chodníky v obci Tuřany
Pridelené·Nov 3
Jednorázové flexibilní ureterorenoskopy“
Pridelené·Nov 3
Vytvorte si účet, preskúmajte túto zákazku a nájdite podobné príležitosti.