The University is delivering the Mary Seacole Building decarbonisation project using funding secured through the Public Sector Decarbonisation Scheme (PSDS). The scheme proposes to undertake a targeted decarbonisation programme and comprises: • Full design, supply and installation of a roof-mounted photovoltaic (PV) array, including associated electrical works, inverters, metering, modifications to existing electrical network and lightning protection adjustments. • Full design, supply and installation of building wide LED lighting replacement, covering approximately 2,200 internal luminaires and 48 external fittings, alongside upgrades to lighting controls, emergency lighting and associated making good of building fabric.
Deadline
23.04.2026
Zverejnené
09.06.2026
Pridelené
09.06.2026
PAHT - Resus area ductwork and fire/smoke damper
Cost Management Services for Ottawa Residence Refurbishment Project
PRP319 Solomon House - Refurb works
ENHT - Theatre 5 and 6 Renovation Works
SUPPLY CHAIN NOTICE_WC1802680 & WC1582259 - (EP0035) Repair the flat roofs Waterproofing membranes at the north and south elevations & JRD Upgrades in line with the Defence Catering Strategy, Episkopi, Cyprus
ENHT - Theatre 7 and 8 Renovation Works
ENQ1290 - Heritage Impact Assessment - Emerging Local Plan Allocations
CA15955 - South Thames College Group - External Audit Services
C472019 - Legal Services for a Court of Protection Matter (30)
DN815224 Lift Consultant - Project Manager
C470510 - Legal Support for Employee Relation Matters- Hempsons
Jobs and Career Services
© 2026 SIA «Vietne». Všetky práva vyhradené.