The supplier will be responsible for the manufacture, fabrication and supply of the precast roof panels for Euston Scissor Box, the supplier will also be required to carry out the stage 5 design including fabrication and shop drawings. The supplier will also be responsible for the temporary works scheme.
Zverejnené
11.06.2026
Otvorené na ponuky
11.06.2026
Deadline
25.06.2026