The Tower Block Dirty Utility Conversion works at Gloucestershire Royal Hospital comprise the conversion of existing dirty utility rooms into bin stores as part of remedial measures to improve fire safety. The scope of works includes isolating and draining down the hot and cold-water services; removing redundant pipework, fittings and waste connections serving the sluice sink; stripping out the existing worktop and wall-mounted fixtures; isolating and removing socket fronts to facilitate the installation of floor-to-ceiling white rock wall cladding with jointing strips; reinstating socket fronts upon completion; providing Chapter 8 barriers to the lift lobby and ward access areas; checking that riser cupboard door locks and slip bolts are operational; and providing a banksman as required.
Deadline
14.08.2026
Zverejnené
08.09.2026
Pridelené
08.09.2026
T0222 - Provision of Replacement Heating System at Evesham Hospital
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
BE049 Parkhouse Street Design and Build Contract
SIXEP/FHP Main Roof Refurbishment Project
CBC-1970-T-SM A&A Works-Single Story Extension - AWARD
Kitchen & Bathroom Replacements
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Všetky práva vyhradené.