This D&B, 2-Stage Contract, is to reconstruct the bridge, including further actions (and not limited to) liaising with Network Rail (BAPA required for the works), ground investigation, scour assessment, obtaining approvals (i.e. LLFA), collaborative working with WAF Legal Team and Landowners, removal of the rock rolls, training walls repairs and construction, culvert repairs and reinstatement of the highway approach. Construction is to take place during the 2027 'in-river working window', or sooner.
Deadline
21.01.2026
Zverejnené
07.07.2026
Pridelené
07.07.2026
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Barrow Multi-Modal Transport Study
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Lot 2A- The Undertaking of Road Safety Studies 2026-2027
Lot 1b - Up to 8 Passenger Seats for Out of County area closing 2 February 2026 (F40)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
CPU 8629 Footway - City Centre Streetscape Resource re Masonry Works
CPU 8627 Western Boulevard Carriageway Resurfacing
Pennyquick Park Play Area
LBH21056 - Greener Homes Initiative 26/27 - Phase 1
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Všetky práva vyhradené.