Zverejnené
29.07.2026
Otvorené na ponuky
29.07.2026
Deadline
08.09.2026
Overhaul Requirement for the C-5 Dual Power Winch (DPW)
Award Notice: F-15 Specialized Engineering and Technical Services/Avionics Systems Supportability Analysis Program
C-130 Pressure Indicator, NSN 6620-01-394-4019 LG / PN 10401N01P00 (8) UNITS
Repair of the C-5 Automated Flight Control System Panel (AFCSP) and Communication/Navigation Panel (CNP)
C-130 Pressure Indicator, NSN 6620-01-394-4019 LG / PN 10401N01P00
SOURCES SOUGHT_C-5 Fire Suppression System (FSS) Component Repair
Repair of the C-130 Power Supply
DISCHARGER,ELECTROS
VALVE,AIRCRAFT
MODIFICATION KIT,AIRCR
PAD ASSEMBLY,TERMIN
TIE DOWN,AIRCRAFT MOOR
DISASTER RESILIENCY PROGRAM PHASE 3, CREECH AFB, NEVADA
Vertical Tank Storage Removal (Sources Sought)
Synthesis of Substances for Pharmacological Testing
Procurement of Rucksacks
Z--HVAC REFURBISHMENT CU-9_NHOTIC for the BLM Vale Di
J--Woods Hole, MA, Main Bldg. Mini-Split Ductless AC
© 2026 SIA «Vietne». Všetky práva vyhradené.