Termen-limită
29.10.2025
Publicat
30.03.2026
Awarded
30.03.2026
Conducting a project annual outcome Survey
Feasibility and detailed design of two liquid nitrogen units as well as the supervision and control of the construction works of the liquid nitrogen production units
Purchase of cryogenic tankers for liquid nitrogen transportation on behalf of RDDP2
Start-up kits for private vets
Conduct feasibility study and CBA for irrigation at Nyawera youth led fodder production project
Renting football and Volleyball piches for one year
Provision maintenance Services of Office equipment
Recruitment for a Head of Business Analysis & Product Requirements for District SACCO Digitalization
Supply of bed kits and kitchen sets
Supply and Installation of Two (2) Elevators (Lifts) at the Tri-Ministerial Building
ISOKO RYO GUPAKIRA NO GUPAKURURA IMIZIGO Y'AKARERE
CONDUCT FEASIBILITY STUDY FOR A 10KM TARMAC ROAD IN THE CITY OF KIBUNGO AND SAKE
© 2026 SIA «Vietne». Toate drepturile rezervate.