The Council requires a suitably qualified contractor to undertake private stormwater–wastewater separation works on up to 106 private residential properties within the Roebuck catchment, as Stage 1 of the wider program of works. The works involve design and installation of dedicated private stormwater drainage, disconnection of stormwater inflows from the wastewater system, and reinstatement of affected surfaces. The contract will be delivered on a measure-and-value basis using a priced Schedule of Prices, with work orders released progressively against confirmed properties. The program timeframe for Stage 1 delivery is 18 months from award of contract. NB: All Tender Files have been attached as Addenda.
Publicat
24.06.2026
Deschisă pentru oferte
24.06.2026
Termen-limită
05.08.2026
Tayler Street Wastewater Pipe Renewal (Eltham)
Ardwick Street Wastewater Renewal
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Hunter Street Water Supply Pipe Renewal
Contract 917 Richardson Upgrades/Renewals for Pipelines - Moffat Road
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Toate drepturile rezervate.