The works comprise of two works packages: replacement of the boiler plant and replacement of the mains LV switchboard. The boiler works are to strip out the existing boilers, flues, pipework and redundant oil tank and replace with four new gas boilers complete with new gas and LTHW pipework, a plate heat exchanger, pressurisation units, air and dirt separators flues, and a temporary boiler to maintain heating during the works, along with all associated electrical, controls/BMS, and builders work. The switchboard works are to remove the existing mains LV switchboard, installing a temporary panel board to keep the building powered and subsequently replace with a new mains LV switchboard, re-terminating and partially replacing the existing submains, and testing/commissioning the full installation in coordination with UKPN including surveys and validations
Termen-limită
27.07.2026
Publicat
28.08.2026
Atribuită
28.08.2026
NCC1917 Bedlington Terrier Football Ground Demolition
Refurbishment of Bichard Building
NCC1917 Blyth civic Centre Construction
ICF Lot 1 - Non Mains Drainage Investigations - Froxfield CE (C) Primary School, Hyde CE (C) Primary School, Itchen Abbas Primary School, Sopley Primary School, Sparsholt CE (C) Primary School - AWARD
25-294: BATCH 18
26179 - Darby House - EV Charging - AWARD
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Toate drepturile rezervate.