The Council has a financial position and legal requirement to obtain 'Best Consideration' for this site. Resources are required to progress commercial delivery of the site, drawing on the following work: - LIDP-funded concept study for a Clean Growth Hub / green industrial park (to completed March 2025)- scoping of site value, disposal and delivery options to achieve Best Consideration by external property consultant Jones Lang Lasalle (Aug - Oct 2025) which will report back initial findings to PAI DMT.A phased delivery process would encompass market assessment and technical studies to investigate the site - topography, soil condition, ecology / biodiversity, accessibility, utilities etc - and actions needed to prepare and de-risk delivery of the site prior to the Council disposing of this site through procuring a delivery or JV partner.
Termen-limită
20.04.2026
Publicat
10.06.2026
Atribuită
10.06.2026
Review Effective Usage of System C's Social Care System
Pre-Patching 2026 (East)
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Children Affected by Parental Offending
Avonmouth Energy Park - Windfarm Management
Interim Support Services
Policy Design Function
Water 2100 Think Tank
Ambulatory Diagnostics Centre - Clerk of Works
The Provision of UKHSA National Bio-surveillance Network - 25/26
Professional Technical Services to Support Exit of 2x FM Contracts
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Toate drepturile rezervate.