The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Publicat
14.11.2024
Deschisă pentru oferte
14.11.2024
Termen-limită
16.12.2024
Talent Acquisition Recruitment Services
Front Line Support Services
SS/CON6484 - Master Data Management Software Implementation and Support
GWM14888 Moneypoint Turbine Overhauls 2024 - 2025
TR1816 ESB Furniture Nationwide Furniture Supply
TR2076 - Mechanical and Electrical Engineering Professional Services for ESB Network Headquarters Building
Call for Tenders for the Provision of Hot School Meals to SN Ros Dumhach 12569C
AP - 06/26 - Fleet Management Services
WCCC26 462 Design Team for proposed Dungarvan Innovation and Business Development Centre
Provision of Replacement of External Windows and Doors at Blessington FETC, Baltinglass OETC and Kildare FETC
Framework 1 (Dublin) for Term Maintenance, Refurbishment and Upgrade construction works to schools for the Department of Education (DoE). Works to Primary, Post Primary and Special Schools
Emergency Pharmacy Services and Supplies to the Irish Defence Forces
© 2026 SIA «Vietne». Toate drepturile rezervate.