The Central Otago District Council is inviting proposals from experienced and qualified contractors for desludging two oxidation ponds at the Cromwell Wastewater Treatment Plant (WWTP). The scope of work covers: • Removal of the existing sludge stored in Geotextile bags (Optional Separable Portion) • Design of a sludge removal methodology, dewatering basin and monitoring programme • Desludging of the two oxidation ponds • Dewatering of the dredged sludge using suitable technology This procurement specifically covers the desludging and dewatering components. Disposal of the dewatered sludge and the new geotextile bag are excluded from the contract works. Desludging is a routine but infrequent maintenance activity essential for maintaining the treatment. The Cromwell ponds have been desludged previously in 2017. Further sludge surveys were conducted in 2026 and confirmed the need for intervention. For more info, see RFP document
Publicat
31.08.2026
Deschisă pentru oferte
31.08.2026
Termen-limită
23.09.2026
Pūnaha Tautoko Pūkenga – Testing Professional Services
ROI - Otara Wastewater Network Upgrade Design Services
RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build
2813 - Stafford Street and Barnard Street Water Services Renewal
Union Street Foxton - Wastewater and Watermain Renewals 2026-27
Greater Greymouth WTP Pre-treatment Upgrade
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Toate drepturile rezervate.