Construction of 258m3 attenuation basin as per designs Construction of new manhole off Yorkshire Water sewer with weir allowing water into basin as per design Construction of Headwall as per design Removal of Waste material as required.
Termen-limită
02.10.2025
Publicat
19.06.2026
Atribuită
19.06.2026
TD2426 - Derby Road Chellaston Drainage Lining
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Toate drepturile rezervate.