The BSI is seeking a supplier to deliver a Battery Energy Storage System (BESS) solution, including supply, installation, commissioning, and integration with the new Main Switchboard and related site electrical infrastructure. The system must support site electrification, improve energy resilience, optimise energy usage, maintain continuity of supply during outages, and enable integration with the new Main Switchboard and future infrastructure.
Publicat
21.06.2026
Deschisă pentru oferte
21.06.2026
Termen-limită
24.07.2026
ROI Non SF6 Circuit Breakers
DB2 Main Switchboard Upgrade (MSB)
Electricity Flexibility Solutions - Upper Clutha Area
Huntly West Domain Courts Renewal
Blue-Green Network Plan & Supporting Implementation Guidance
327349 - Lift Replacement in MSB and G Block
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
© 2026 SIA «Vietne». Toate drepturile rezervate.