Publicat
18.09.2026
Deschisă pentru oferte
18.09.2026
Termen-limită
24.09.2026
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
Proj #TBD | Elevator Modernization | Elias/Prather
Martinsburg, WV Warehouse IOTA
646-24-100 | Elevator Upgrade Bed Tower | Pittsburgh - UD
Burlington, VT and Cheshire County IOT&A
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
Repair RTS Multiple Buildings
MCB Camp Pendleton, CA Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
PMEL Freezer Farm Renovation Project
Prequalification of Sources for Construction Services to include Design-Build (DB) and Design Bid-Build (DBB) for the U.S. Army Corps of Engineers (USACE) Honolulu District, Area of Responsibility (AOR), Primarily on Kwajalein Atoll, Republic of the Marsh
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
B268 Replace STUS Backup Generator
C--WOOLPERT GEOSPATIAL PRODUCTS AND SERVICES CONTRACT v4 (GPSC4)
SR Power Supplies Rack Detailed Design for ALS-U
Emergency Response Wraparound Services
Wheat DNA Library Sequencing
Cable Fiber Install ATC Tower Dobbins ARB
J--Flooring Replacement and Baseboard, Bldg 50, BIA,
© 2026 SIA «Vietne». Toate drepturile rezervate.