Expression of Interest T5D MEP Subcontractor T5D Attenuator Overhaul (Survey / RIBA 4iii) Scope The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (level 7) via Airside. The objective is to replace the four attenuators in the T5D Shaft because they are at their end of life. The renewal of the T5D attenuators aims to reduce the risk of debris entering fans, tunnels and station, prevent the fans from failing in any fire scenario and provide ventilation and smoke clearance for the Heathrow Rail Tunnels. This improves safety conditions in Heathrow Rail Tunnels and improves resilience of systems. In addition, less maintenance and repair are required for the attenuator. Each attenuator is formed of four quadrants weighing around 1160 kg. Review MEP systems along the airflow and advise replacement/modification to bring them up to compliance. Surveys will be carried out by MEP Subcontractor under the direction of the Design Consultant (Employed by the Client). Item Question Q1 What capability do you have of understanding the requirements for replacing attenuators etc., considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the T5D Shaft during non-operational hours to provide all the information required to complete the RIBA 4ii design by the Design Consultant and the RIBA 4iii by the MEP Subcontractor? • M&E Services within the air path • Fan and Attenuator • Structure Note: - RIBA 5 onwards including construction is excluded.
Publicado
02.06.2026
Aberto para propostas
02.06.2026
Prazo
09.06.2026
WP6235 -T5D MEP Subcontractor
Fechado·Jun 2
WP1140 - T5D Design Consultant
Fechado·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Fechado·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Fechado·Jun 2
WP1140 - T5D Design Consultant
Fechado·Jun 2
WP2140 - TR19 MEP Surveys
Fechado·May 7
Arts and Sports Bridge - Pre-Construction Professional Services
Concedido·Sep 23
HVAC design and Support services 2026
Concedido·Jul 31
Project Callisto
Fechado·Jul 6
Members' Tea Room Refurbishment Project - MDS4001
Concedido·Jun 25
Cbip-Ws2-Risk Reduction-Mds-Riba2-Fwk1146-Mds4003
Concedido·Jun 25
Mds for Underground Car Park and Critical Services Works
Concedido·Jun 25
The Responsible Medical Officer (RMO) Braintree
Concedido·Oct 26
The Purchase of 8 seater Vehicles
Concedido·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Concedido·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Concedido·Oct 26
37418 - West Gate School
Concedido·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Concedido·Oct 26
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.