Publicado
04.11.2026
Concedido
04.11.2026
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Concedido·Nov 4
USS OKANE (DDG-77); 7mrb0604 Standalone
Aberto para propostas·Nov 3
Southwest Regional Maintenance Center (Swrmc) Submarine Repair Follow-on Multiple Award Contract (Mac) Indefinite Delivery Indefinite Quantity (Idiq)
Aberto para propostas·Oct 28
FUSION SUPPORT - system analysis, software and system engineering and analysis, development, application and customization, and technical writing services.
Concedido·Oct 26
PC2.5 Engine Overhaul Training
Fechado·Oct 23
Uss Cincinnati (Lcs-20) - Dsra Lltm
Fechado·Oct 23
Connecting Rod,Piston
Aberto para propostas·Nov 4
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Concedido·Nov 4
Motor Assembly,Elec
Aberto para propostas·Nov 4
Air Cleaner,Intake
Concedido·Nov 4
Vacuum Bleed Filter,Em
Aberto para propostas·Nov 4
Muffler,Exhaust
Concedido·Nov 3
M-Series Corridor Reroof
Aberto para propostas·Nov 5
Pulaski Early Education Center Mechanical Renovations
Aberto para propostas·Nov 5
Warner Elementary School Roof Replacement
Aberto para propostas·Nov 4
DTCC Owens Carter Dental Health Center
Aberto para propostas·Nov 4
Dry Cleaning Services
Aberto para propostas·Nov 4
Industry Feedback Requested: Fort Worth District Draft Division 01 Specification for Other Transaction Authority Process
Aberto para propostas·Nov 4
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.