Loading Otnox...
Otnox
UKReino Unido·Comprador: Ferrovial BAM Rail Systems

Temporary Works Designer - Framework

Fechado·1 mai 2026·GBP 1,000,000

To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.

Publicado

01.05.2026

Aktīvs

01.05.2026

Prazo

15.05.2026

Otnox

Encontre licitações das quais vale a pena participar.

Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.

  • Documentos da licitaçãoConsulte os arquivos disponíveis em um só espaço de trabalho.
  • Requisitos e riscosSolicite uma análise dos documentos com referências às fontes.
  • Sua seleção de licitaçõesContinue com os mercados e setores selecionados.