Replacement of playground at Swanley Recreation Ground. To create a wetpour base with a new wetpour safety surface which compiles with BSEN 1176 and has a minimum guarantee of 2 years but preferably longer. A maintenance plan is a desirable extra service we would like. The product should have been tested in accordance with BS EN 1177 and BS EN 7188. To remove existing equipment, wetpour and then top soil with seed the current playarea and replace with new equipment in a new location on the Recreation Ground with a significantly uplifted play value compared to the current playground. The area and equipment where possible should follow a space theme. On-site meetings are essential with supporting information provided at that meeting.
Prazo
16.01.2026
Publicado
05.02.2026
Awarded
05.02.2026
Play Area Replacement at St Johns Open Space, Newton-le-Willows
Concedido·Oct 28
Bespoke Playground for Bouverie Square, Folkestone
Concedido·Oct 22
West Bridgford Playground Refurbishment - Toddler and Junior Area - The Hook Lady Bay
Concedido·Oct 19
ENQ1326
Concedido·Oct 14
Skateboard Park Remodelling
Aberto para propostas·Oct 6
Whittle Street Play Area
Concedido·Oct 5
Debtor Tracing Services
Concedido·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Concedido·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Concedido·Oct 28
CSP26893 - Administrator
Concedido·Oct 28
Portering Task Management System
Concedido·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Concedido·Oct 28
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.