Scope of Works The outline below, and the grounds map specifications (Appendix D), detail the required works, which include: Scope of Works • Cleaning and Preparation o Eliminate weed growth around edges (note: the courts are fenced in so no Harris fencing is required) o Pressure wash, hand clear and/or chemically clean natural growth (moss, weeds, etc) as well as possible. o Jet wash of the surface to remove any remaining organic matter o Include a biocide treatment to the entire surface to kill any remaining moss spores • Surface Repair o Dig out all damaged or cracked surface areas in order to refill where repairs are needed to create a smooth surface. • Surface Coverage with PlastiRoute o Apply the full colour coverage using specialist super-durable paint from the PlastiRoute range. • Line Marking o All courts to be painted with white lines for both tennis and pickleball (see Appendix E for desired lines) • Completion and Clearance o Remove equipment and all associated waste materials. o Final clearance of the site, leaving it clean and tidy upon completion. All works must be carried out in accordance with the specifications provided herein and in compliance with heritage and conservation regulations applicable to listed buildings. For any further information, details or queries, please contact: Projects@Hythe-tc.gov.uk
Publicado
20.03.2026
Aktīvs
20.03.2026
Prazo
16.04.2026
Grounds Maintenance including Sports Pitches
Aberto para propostas·Oct 12
Grounds Maintanence
Aberto para propostas·Oct 12
Refurbishment of Multi-Use Games Area - Extended
Fechado·May 11
Resurfacing of Hard Tennis Courts - Extended
Fechado·May 11
Eaton Lands - tree felling works
Concedido·Mar 20
Refurbishment of Multi-Use Games Area
Fechado·Mar 20
Accountancy Apprenticeships
Concedido·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Concedido·Oct 29
Transition and Exit Technical Support Service
Concedido·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Concedido·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Aberto para propostas·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Concedido·Oct 29
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.