The provision of Quantitative Risk Analysis Support for the duration of the Arena Infrastructure Project (2026-2028). Call Off Contract from the West of England Combined Authority (WECA) NEC4 Professional Services Framework 2 (PSF2). The service is being commissioned to provide a quantitative risk report on a quarterly basis to help establish costs and risk to the project.
Prazo
05.03.2026
Publicado
16.07.2026
Concedido
16.07.2026
Oaktree Av. & Finch Subways Structural Assessments
Concedido·Sep 30
West & North Street Railway Bridge Structural Assessments
Concedido·Sep 30
Bus Shelters A432 - Additional Bus Shelters on A432 Scheme
Concedido·Aug 13
Bus Shelters A38 - Additional Bus Shelters on A38 Scheme
Concedido·Aug 13
Reablement Service
Concedido·Aug 11
Highway Design Engineer - Consultancy Engineer Support
Concedido·Aug 6
Asbestos surveying and consultancy
Concedido·Oct 27
CBC-1917-Q-SM Water Risk Assessments - AWARD
Concedido·Jun 23
Fire Risk Assessments, Kingston Upon Hull
Concedido·Nov 25
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Concedido·Oct 31
March 2027 Bus Contracts
Concedido·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Concedido·Oct 30
Provision of Pre-Paid Cards
Concedido·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Concedido·Oct 30
Business Travel Services
Concedido·Oct 30
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.